Unit 911

Scope:

  • Remove all ceiling tiles and insulation, replace both
  • Remove all flooring
  • Remove all debris/junk. You can leave any fixtures that are attached to the walls or floor
  • Replace lighting covers
  • Patch (level 4 finish) and paint interior white (all doors and walls)
  • Replace address stickers with stickers of 4 inch height above door frame
  • Remove material from interior window (leasing sign stays)